Building
Contsruction: Root causes of calamities need
redress.
New Construction
Regulatory Framework: Long awaited bill promises
to put activities in corrective perspective. UACE proposes
a framework to address impassein times to come.
Grid Power Crisis:
Offers for viable options in the short to medium-term
in the supply of grid electricity.
Metal Forming
Sub-Sector: First steps for enhanced design practices.
Productions
& Operations Management: Schedules for phased
development activity in metal fabrication. |
- Bwebajja probe report out:
structure collapses, kills 11 injures 26!
- Building Control Bill in
offing: Task force to survey building procedure compliance
- Necessary reforms in contsruction
sector - views of Uganda Association of Consulting Engineers
(UACE)
- Low water levels at the
source of River Nile and delayed Bujagali dam contruction
raise power deficit significantly
- Proposed design approach
in metal fabrication sub-sector
- A step-by-step growth activity
program
|