home features resources industry news bids and contracts phantom solutions  
                         

Thermal Power Generation: Narrowing the Shortage Gap

Paul Sagala

PhD, Reg. Eng. (U), Chairman, UACE :


Abstract

The Government of Uganda (GoU) took a bold decision to alleviate the incessant power shortage through adding on line a 50-megawatt (MW) boost through thermal generation from diesel. This has been timely, given the thwarted Bujagali dam construction timely realization in 2005, arising from negative public opinion of environmentalists and residents in the vicinity.

To read the rest of this, and all our other articles please click here to download the complete March 2005 issue in PDF version.

 
 Copyright © 2012 Phantom Solutions Privacy Policy | Terms of Use Designed by Infoma